1. Contracted work: Design, manufacture and installation of:
    1. stainless steel and frameless glass balustrade
    2. glass roof supported by a steel structure
    3. glass elevator enclosure, door and walls
    4. powder painted steel balustrade
    5. special order - steel pylon sculpture and benches

Customer: City of Krakow

Architect: AIR Jurkowscy-Architekci Sp. z o.o., Katowice

Year: 2011

  • Main entrance, glass door with stainless steel fittings. Wheelchair ramp with frameless glass balustrade with stainless steel double handrail
  • Glass roof with laminated glass panels on steel construction.
  • Frameless glass balustrade with stainless steel double handrail on wheelchair ramp
  • Topless frameless glass balustrade
  • Glass door with stainless steel fittings. In side walls, glass doors with powder painted steel frame
  • Glass door with stainless steel fittings in pivoting system
  • Glass covered lift shaft.
  • Glass covered lift shaft.
  • Glass wall mounted to the ceiling and floor with I-beam profiles
  • Powder painted steel balustrade with horizontal bars
  • 8 meter high pylon sculpture made of galvanised and painted steel on a concrete pedestal
  • Steel door with powder painted steel frame and filling made from steel bars